Selected offshore projects demonstrating KEA’s ability to execute technically demanding scopes safely, efficiently and under operational pressure.


Bahamas

Coega Harbour, South Africa
Scope
KEA Projects delivered fabrication, structural and mechanical
installation for the COSL Prospector during a port stay in Coega
Harbour, including IWOCS HPU installation, SSTT assembly, moonpool
modifications, drill floor piping, bucking unit and control console
installation, as well as wireline foundation modifications.
Outcome
Pre-fabrication was completed at KEA’s Cape Town facilities, followed
by offshore installation onboard in just eight days. The project was
delivered safely, on time and within budget, with no harm to personnel,
equipment or the environment.

Port of Cape Town and Saldanha
Scope
550 Tons Fabrication and installation of HOP, DMA and lifting Equipment
Outcome
Fabrication and integration of a 260 tonne hang off platform and 200 tonne dead man anchor including rope access installation works and NDT inspection.
Large scale fabrication was completed at KEA’s Saldanha Bay facility
before integration during a three month port stay in Cape Town.